KCE completed the design, permitting and construction of several upgrades to the Palmerton public water supply to bring the entire water system into compliance with the new DEP 4-LOG Treatment Requirements. The project also included the installation of several sections of water main, along with the replacement of several pipe sections within the existing water system reservoir. Other improvements included the installation of a new chlorine analyzer and several updates to the existing chlorine testing procedures.
Palmerton Municipal Authority 4-Log Treatment Upgrades