KCE completed the design, permitting, competitive bid package preparation, and construction oversight for a new 2-story fire station building located at intersection of Fifth Street and Lehigh Avenue in the
KCE has been working on the planning and permitting of various parts of Grange Road Park in Upper Macungie Township since its inception. Most recently KCE completed the permitting and design for the park's splash park, which included coordinating the grant funding to bring the project to life.
Keystone Consulting Engineers, Inc. (KCE) prepared the plans and permits to build this pedestrian bridge at Breinigsville Park, over the Schaefer Run. Project funding was in part by the Pennsylvania Department of Conservation and Natural Resources (DCNR), the Natural Resources Bureau of Recreation and Conservation and the Keystone Recreation, Park and Conservation Fund.
Keystone Consulting Engineers, Inc. (KCE) completed the design and construction of a sidewalk area, ADA access/handicap access ramp, retaining wall, water line relocation, and pavement restoration for the Lansford Borough Police Building located in the Borough of Lansford.
Keystone Consulting Engineers, Inc. (KCE) prepared the master plan for 3.5 miles of the Slate Heritage Trail as part of a project partially funded by DCNR. Work included all aspects of planning and design of the trail and accessory facilities. The project included overseeing the design and construction...
Keystone Consulting Engineers, Inc. (KCE) developed grading, erosion and sediment control and post construction stormwater management plans for this first-in-the-Lehigh Valley pilot project to convert an existing conventional detention basin into a naturalized detention basin on an approximately eight (8) acre site.
KCE has provided park planning, design and construction management for many parks and recreation facilities, including trail systems and both passive and active recreation parks. One such park under development is the Grange Road Park in Upper Macungie Township (Lehigh County, PA).
KCE completed the design, permitting and construction of a large storm drainage improvement project throughout the South Stroudsburg area. The project also included the installation of curb, sidewalk, handicap ramps, and pavement improvements.
KCE completed the design, permitting and construction of several upgrades to the Palmerton public water supply to bring the entire water system into compliance with the new DEP 4-LOG Treatment Requirements. The project also included the installation of several sections of water main, along with the replacement of several pipe sections within the existing water system reservoir.
Tuskes Community Park is a 52-acre multi-use recreational facility in Upper Nazareth Township. The park was originally developed as part of a public-private partnership between the Township and a private developer.