A release occurred from an unregulated 10,000-gallon petroleum underground storage tank (UST) impacted soils, groundwater, and an adjacent stream. The remedial action consisted of excavation of the source area and
Keystone Consulting Engineers, Inc. (KCE) completed the design and construction of a sidewalk area, ADA access/handicap access ramp, retaining wall, water line relocation, and pavement restoration for the Lansford Borough Police Building located in the Borough of Lansford.