KCE performed an in-depth GIS (Geographic Information System) analysis and design for this large subdivision and land development project, which involved extensive construction stakeout and other surveying services over several
KCE provided AutoCAD services, pre and post-survey calculations, detailed stake-out, existing feature/topographic surveys of main tie-in points, and establishment of an intricate system of permanent survey control in NAD 83
KCE provided AutoCAD services, pre- and post-survey calculations, detailed stake-out, existing feature/topographic surveys of main tie-in points, High Wall Monitoring, and the establishment of an intricate system of permanent survey
KCE supplied survey support (pre-survey calculations, plan review, file conversion, benchmark establishment, and field layout of column lines) for horizontal and vertical control at ArtsQuest’s SteelStacks Campus and the Performing
KCE has been managing a multi-year project to map utilities and appurtenances throughout the Township and create a GIS-based infrastructure management system. KCE’s work will improve emergency response, maintenance scheduling
KCE was contracted by the Bethlehem Steel Corporation to provide comprehensive civil engineering services for the initial master redevelopment planning and installation of road and utility infrastructure as part of
Tuskes Community Park is a 52-acre multi-use recreational facility in Upper Nazareth Township. The park was originally developed as part of a public-private partnership between the Township and a private
The new St. Luke’s University Health Network Anderson Campus is located on 500 acres near the Lehigh River at the intersection of Rt. 33 and Freemansburg Avenue in Bethlehem Township.